Solutions · By Vessel Type
Heavy-Lift & Project Cargo Vessels with SecureLoad
Who Uses SecureLoad on Heavy-Lift & Project Vessels
On the ship
On shore
Heavy-Lift / Project Cargo Engineers
Design and verify lifts, stows and lashings on real vessel geometry, then document the engineering behind every decision.
Port Captains / Superintendents
Review and challenge plans before the vessel arrives, support operations during critical lifts and resolve changes with updated cases.
Chartering / Project Logistics Teams
Assess which vessel and rotation can actually take the project, and present technically backed options to shippers, MWS and clients.
Heavy-Lift & Project Cargo Realities
Engineering & Planning
- Complex units with tight clearances, sensitive CoGs and non-standard lifting configurations.
- Several candidate vessels, port calls and sequences for the same project—each with different constraints.
- Pressure to prove technical feasibility early, both internally and to customers / MWS, before committing the vessel.
Execution & Communication
- Hard to communicate true 3D intent and sequences using 2D drawings and email chains alone.
- Last-minute changes in cargo, route or weather windows that force rapid rework of plans and calculations.
- Surveyors and clients demanding transparent calculations, assumptions and documentation they can audit.
How SecureLoad Supports Heavy-Lift & Project Work
3D Stowage Planner
Acceleration & 3D Lashing
Loading Computer
From Concept Sketch to Approved Heavy-Lift Plan
Capture Cargo & Lifts
Design Stow in 3D
Run Lashing & Motion Checks
Verify Vessel Loading
Generate Package for Approval
What Changes With SecureLoad
Before SecureLoad
Multiple disconnected tools and files—CAD, spreadsheets and separate lashing calculators for each project.
No single “source of truth” as cargo, routing or weather windows change over time.
Back-and-forth with surveyors and clients over assumptions, forces and safety margins.
With SecureLoad
3D stow, lashing and loading checks all anchored on the same vessel and cargo data.
Traceable scenarios from early concept through iterations to the final approved plan.
A clear, consistent documentation package aligned with what surveyors and customers expect to see.
Multi-Port, Multi-Unit Campaign Support
Plan full campaign sequences
Plan sequences across multiple ports, including intermediate stows, temporary positions and backloads.
Compare different orders and options
Evaluate different orderings of lifts, ports and units to see which campaign pattern is safest and most efficient.
Reuse proven project setups
Save successful project configurations as templates you can adapt for similar campaigns in the future.
Communicate Plans Clearly to Customers and Surveyors
Share 3D views and clear plan snapshots instead of relying only on 2D drawings and markups.
Provide transparent calculations and utilisation factors so assumptions are easy to audit.
Capture remarks, comments and approvals against specific scenarios, not loose files and emails.
Typical deliverables
- 3D views / images of stow and seafastening
- Lashing plans for deck and holds
- Summary calculation sheets for motions, forces and margins
Resources for Heavy-Lift & Project Cargo Teams
Deep-dive into how SecureLoad works in real operations.
Blog
Engineering Heavy-Lift Voyages with One Source of Truth
How connecting 3D stow, lashing and loading checks reduces rework and friction with surveyors on complex project campaigns.
Videos
Heavy-Lift Workflow in SecureLoad – Short Demo
Watch a sample heavy-lift case move from concept sketch to approved plan using 3D Stowage Planner, Acceleration & 3D Lashing and the Loading Computer.
Downloads
Heavy-Lift & Project Cargo with SecureLoad – One-Pager
A concise overview of how SecureLoad supports lift planning, stowage, lashing and loading for demanding heavy-lift projects.
